• Extension of existing HWS & HWR pipes to the new heat exchange system in the North Incinerator Facility. • New Ash Slurry piping. • High Pressure Steam Piping (TSSA) • Medium Pressure Steam Piping (TSSA) • Low Pressure Stam Piping (TSSA) • Boiler Feed Water Piping (TSSA) • Sand Silo Piping (TSSA) • Exhaust … Read more
Upgrade to the Pumping Station by changing sections of the suction and discharge piping for the High Lift and Low lift pimps. • 42″Ø Discharge piping complete with 24″Ø fabricated branches and custom made S.R mitered reducing elbows. • Upto 24″Ø Suction piping. LORNE PARK – PROCESS PIPE DRAWINGS – PART 1
54″Ø Interconnect piping with 54″Ø short radius mitered elbows fabricated in house. 60″ Header with 48″Ø, 42″Ø & 36″Ø fabricated branches for Valve Chamber updates. 001 – 1350Ø INTERCONNECTION – REV 2 002 – 1500Ø MAIN IN VALVE HOUSE – REV 3 – 3D & EL.