Category: Recent Projects


Duffin Creek WPCP-Biosolids treatment Replacement Contract 1

By maplevale,

• Extension of existing HWS & HWR pipes to the new heat exchange system in the North Incinerator Facility. • New Ash Slurry piping. • High Pressure Steam Piping (TSSA) • Medium Pressure Steam Piping (TSSA) • Low Pressure Stam Piping (TSSA) • Boiler Feed Water Piping (TSSA) • Sand Silo Piping (TSSA) • Exhaust  … Read more

Lorne Park Water Treatment Plant Station Upgrades

By maplevale,

Upgrade to the Pumping Station by changing sections of the suction and discharge piping for the High Lift and Low lift pimps. •  42″Ø Discharge piping complete with 24″Ø fabricated branches and custom made S.R mitered reducing elbows. • Upto 24″Ø Suction piping. LORNE PARK – PROCESS PIPE DRAWINGS – PART 1  

Rosehill Reservoir Rehabilitation

By maplevale,

54″Ø Interconnect piping with 54″Ø short radius mitered elbows fabricated in house. 60″ Header with 48″Ø, 42″Ø & 36″Ø  fabricated branches for Valve Chamber updates. 001 – 1350Ø INTERCONNECTION – REV 2 002 – 1500Ø MAIN IN VALVE HOUSE – REV 3 – 3D & EL.

Niagara High Lift Pumping Station

By maplevale,

niagara

Region: Niagara Region Project: South Side High Lift Sewage Pumping Station upgrades Contractor: Straight line Group