Duffin Creek WPCP-Biosolids treatment Replacement Contract 1
Filed under: Current Projects, Recent Projects
• Extension of existing HWS & HWR pipes to the new heat exchange system in the North Incinerator Facility.
• New Ash Slurry piping.
• High Pressure Steam Piping (TSSA)
• Medium Pressure Steam Piping (TSSA)
• Low Pressure Stam Piping (TSSA)
• Boiler Feed Water Piping (TSSA)
• Sand Silo Piping (TSSA)
• Exhaust Air Piping.
• HWS & HWR Piping.