Lorne Park Water Treatment Plant Station Upgrades

By maplevale,

  Filed under: Recent Projects

Upgrade to the Pumping Station by changing sections of the suction and discharge piping for the High Lift and Low lift pimps.

•  42″Ø Discharge piping complete with 24″Ø fabricated branches and custom made S.R mitered reducing elbows.

• Upto 24″Ø Suction piping.

LORNE PARK – PROCESS PIPE DRAWINGS – PART 1