Lorne Park Water Treatment Plant Station Upgrades
Filed under: Recent Projects
Upgrade to the Pumping Station by changing sections of the suction and discharge piping for the High Lift and Low lift pimps.
• 42″Ø Discharge piping complete with 24″Ø fabricated branches and custom made S.R mitered reducing elbows.
• Upto 24″Ø Suction piping.
LORNE PARK – PROCESS PIPE DRAWINGS – PART 1