Maplevale Fabrications
  • Home
  • About
    • About Maplevale
    • Building Information Modeling
  • Services
    • Welded Pipe Fabrication
    • Custom Metal Fabrication
    • Structural Steel Fabrication
    • Pressure Vessels
    • Mobile Welding Services
  • Gallery
  • QA
  • Recent Projects
  • Contact
 

Recent Projects

Maplevale Fabrication > Recent Projects > 2019 > February

Lorne Park Water Treatment Plant Station Upgrades

By maplevale, 28th February 2019

Upgrade to the Pumping Station by changing sections of the suction and discharge piping for the High Lift and Low lift pimps.

•  42″Ø Discharge piping complete with 24″Ø fabricated branches and custom made S.R mitered reducing elbows.

• Upto 24″Ø Suction piping.

LORNE PARK – PROCESS PIPE DRAWINGS – PART 1

 

Rosehill Reservoir Rehabilitation

By maplevale, 28th February 2019

54″Ø Interconnect piping with 54″Ø short radius mitered elbows fabricated in house.

60″ Header with 48″Ø, 42″Ø & 36″Ø  fabricated branches for Valve Chamber updates.

001 – 1350Ø INTERCONNECTION – REV 2

002 – 1500Ø MAIN IN VALVE HOUSE – REV 3 – 3D & EL.

Categories

  • Recent Projects

Recent Posts

  • Lorne Park Water Treatment Plant Station Upgrades
  • Rosehill Reservoir Rehabilitation
  • Niagara High Lift Pumping Station
  • Speedsville Sanitary Pumping Station
  • Toronto Island Treatment Plant

Archives

  • February 2019
  • March 2017
  • January 2017

© 2023 Maplevale Fabrications Inc. All Rights Reserved. Sitemap | Privacy Policy.

Top