By maplevale,
11th April 2024
• Extension of existing HWS & HWR pipes to the new heat exchange system in the North Incinerator Facility.
• New Ash Slurry piping.
• High Pressure Steam Piping.
• Medium Pressure Steam Piping.
• Low Pressure Stam Piping.
• Boiler Feed Water Piping.
• Sand Silo Piping.
• Exhaust Air Piping.
DUFFIN CREEK – WATER POLLUTION CONTROL PLANT
By maplevale,
11th April 2024
• New 48″Ø & 42″Ø 316 SS Sch 40 piping in Chambers.
• New piping in Pumping Station.
• New generator piping.
By maplevale,
28th February 2019
Upgrade to the Pumping Station by changing sections of the suction and discharge piping for the High Lift and Low lift pimps.
• 42″Ø Discharge piping complete with 24″Ø fabricated branches and custom made S.R mitered reducing elbows.
• Upto 24″Ø Suction piping.
LORNE PARK – PROCESS PIPE DRAWINGS – PART 1
By maplevale,
28th February 2019
By maplevale,
15th March 2017
Region: Niagara Region
Project: South Side High Lift Sewage Pumping Station upgrades
Contractor: Straight line Group
… Continue reading
By maplevale,
15th March 2017
Project: Speedsville Sanitary Pumping Station
General Contractor: Stone Town Construction
… Continue reading
By maplevale,
13th January 2017
Region: City of Toronto
Project: Island Treatment Plant – Residual Management Facility Phase 1 Upgrades.
General Contractor: Alberici Constructors
… Continue reading